RV Conversions By WE FAB

Conversion will be done by Kevin Wardrip. Many years of experience. To contact and preview work please click on the button above.

Consultation required first and start at $400. 

Builds will be under contract.

Parts will be paid for and physically be here before work will start to guaranty we meet deadline.

1/2 Labor plus $3000 due when vehicle is dropped off. Will be subtracted from total when vehicle is done.

Details will be discussed at consultation. 6 weeks into build no changes can be made to meet deadline. 

Custom work extends deadlines.

Below is tentative and can be changed.


Levels

Partial Builds

Time frame 7 to 9 Weeks
$13000 Labor ( estimate 170 hours)
$4500 Materials base cost, no components. May very depending on consultation
$8500 Parts 

Floors, Ceiling, Walls, Fridge Structure, Sink Structure, Bed structure, Fans and Basic electrical. Basic electrical includes 2 wall outlets, 2 USB outlets, solar wiring prep, 2nd roof fan wiring prep, shore power, lighting, vehicle charge wiring, DC to DC, Inverter with Charger 1200w, 2 Batteries 200aH. Diesel Heater with single roof fan.

$26,000


Full Builds
Time Frame 10 to 13 weeks
$22000 Labor ( estimate 300 hours)
$6000 Materials base cost, no components.  May very depending on consultation.
$17000 Parts
$3600 Upholstery. List of materials and colors available upon consultation appointment. 

Floors, Ceiling, Walls, Fridge Structure, Sink Structure, Bed structure, Fans cut out, filler trim. Electrical includes 2 wall outlets, 4 USB outlets, solar wiring, roof fans wiring, shore power, lighting, vehicle charge wiring, DC to DC, Inverter with Charger 2000w, 3 Batteries(300 aH) and Fridge. Roof Rack with solar panels, awning and 2 fans. All panels Floors, Ceiling, Walls Upholstered and Counter tops. Plumbing for sink, water container, grey tank, water pump. Diesel Heater and Passenger side swivel seat. 

$48,000


Custom Jobs
$85 per hour
These jobs are time and material, meaning straight time to do the job and materials needed to finish the job. No set time or cost. 
Examples: Showers, Bathrooms, special sizes or shapes changes, extra components. 
Customer purchasing own parts and asking to install is custom.